• Tue, 02/19 | Men's Basketball at University of Southern Maine L, 85-65 (Final) BX | RC
  • Sat, 02/16 | Men's Basketball at Eastern Connecticut State University L, 74-44 (Final) BX | RC
  • Wed, 02/13 | Men's Basketball at UMass Dartmouth W, 76-74 (Final) BX | RC
  • Mon, 02/11 | Men's Basketball vs. Plymouth State University W, 65-64 (Final) BX | RC
  • Tue, 02/05 | Men's Basketball vs. University of Southern Maine W, 69-55 (Final) BX | RC
  • Men's Sports
    • Baseball
    • Basketball
    • Cross Country
    • Hockey
    • Lacrosse
    • Soccer
    • Tennis
    • Track & Field
  • Women's Sports
    • Basketball
    • Cross Country
    • Hockey
    • Soccer
    • Softball
    • Tennis
    • Track & Field
    • Volleyball
  • Inside Athletics
    • About Athletics
    • Camps and Clinics
    • Community Outreach
    • Composite Schedule
    • Directions to Campus
    • Facilities
    • Facilities Request Form
    • Master Facilities Schedule
    • History and Tradition
    • Quick Facts
    • Staff Directory
  • Sports Medicines
    • Information
    • Staff
    • Sports Medicine Manual
    • Resources
    • Student Athletes
    • Drug Testing Program
  • Speacial Projects
    • Home Page
    • Strategic Plan
    • Hall of Fame
    • Distinguished Alumnus Award
    • YES with Africa
    • Golf Outing
    • YES with Africa-UMass Boston Partnership
    • Harbor Point Agreement
    • Beacons and Beyond
  • Academics
    • Eligibility
    • Policies
    • Regulations
    • Responsibilities
    • Standards
    • Support Services
  • Intramurals
    • Community Membership
    • Fitness
    • Intramurals
    • Swimming Pool
    • Waterfront Recreation
    • Contact
Home | Roster | Schedule/Results | Statistics | News | Coaches | History | Records | 1,000 Point Club | Recruit Questionnaire | Give a Gift to Men's Basketball
 

Clark Center Gym Renovation

  • Crews remove an entire section of paneling from the bleachers
  • Crews begin work on the bleachers
  • Another look at the Clark Athletic Center gym
  • What the original Clark Athletic Center looks before it undergoes the renovation
  • Work on the clark center begins with the dismantling of the bleachers
  • The wood and metal from the bleachers are piling up fast in the Clark
  • More boards are removed from the bleachers on both sides of the court
  • Three sections of the bleachers on the right wall have been completely removed
  • Almost all the bleachers on the left side of the gym are gone.
  • A bobcat loads up the steel from the bleachers to be thrown in a dumpster outside of the gym.
  • Another look at the bare wall on the left side of the gym.
  • The construction crews are moving along quickly with the removal of the bleachers.
  • The bleachers have been completely removed from the left side of the wall.
  • This is the first time that Clark Gym has been without bleachers in over 30 years.
  • Bleachers have been taken down on the right side of the wall.
  • Another look at the bare wall.
  • A look at the dividers from a top of the walkway.
  • The crews continue to rip up the original floor which has been down for over 30 years.
  • Parts of the wood floor are coming up in the second part of the gymnasium.
  • More views of the floor as it gets ready to ripped up.
  • A downward view of the original floor.
  • More views of the floor as it gets ready to ripped up.
  • More views of the floor as it gets ready to ripped up.
  • Another look at the all-purpose floor.
  • The crews continue to rip up the original floor which has been down for over 30 years.
  • The floor has been stripped down to the concrete.
  • The construction crew has stripped off the flooring.
  • The floor has been stripped down to the concrete.
  • A look at the flooring and vents to pump out all the dust.
  • A pile of wood and all-purpose surface are pilling up fast.
  • More views of the floor as it gets ready to ripped up.
  • Crews are moving quickly when it comes to removing the original surface.
  • The floor is coming up and you can start to see the original all-purpose flooring.
  • The over 30 year old all-purpose flooring can be seen with the removal of the hardwood.
  • A full look at the gym with the concrete floor.
  • The floor is completely stripped showing just the concrete foundation.
  • Another shot of the concrete floor.
  • The bobcat scoops up what was left of the all-purpose floor.
  • A look at the gym floor completely stripped down and with all the heavy equipment removed.
  • A look at the gym floor completely stripped down and with all the heavy equipment removed.
  • A look at the gym floor completely stripped down and with all the heavy equipment removed.
  • One of the original entrances to the gym has been removed to make way for the new more open entrance.
  • A look at the entrances to the gym closed off from the Clark lobby.
  • Another wide shot of the gym as it continues to get ready for the 12-13 season
  • The crew has ripped up the floor to lay the utility box for the outlets and ethernet connections.
  • A long look at the two entrances leading into the gym.  Both will be replaced with more wide-open entrances.
  • The far exit has been removed and replaced with wood.
  • The other far exit has also been removed and the air vents have been placed there to keep the air clean.
  • The area for the new outlet boxes have been sealed over with concrete.
  • Another wide angle shot of the main entrances which were torn down following the floor removal.
  • Crews are applying the new surface that will cover the concrete.
  • A look at the gym as they begin the process of getting it ready for the brand new hardwood.
  • The new gym will have a ton of new internet and power lines running through it as can seen by all the piping on the wall.
  • A look at the new court.
  • The hardwood has finally arrived and the crew is starting to layout the first layer.
  • A wide look at the wood and the plastic surface that is going under the court.
  • The crews are starting to layout the wood.
  • The hardwood is on the floor.
  • Another look at the crews installing the hardwood.
  • Another look at the crews installing the hardwood.
  • Another look at the crews installing the hardwood.
  • A look at the hardwood as it gets nailed to the floor boards.
  • Another look at the brandnew hardwood.
  • The floor boards are down.
  • Another look at the brandnew hardwood.
  • Another look at the brandnew hardwood.
  • Boxes and boxes of bleacher parts and seats.
  • The bleachers have arrived.
  • A look at the floor where the white stain has been applied for inside the 3-point arc.
  • A look at the entire floor with the white stain on the game court.
  • The new stage lighting that will allow UMB to host a variety of events in the gym.
  • A look at the brand new lighting in the gym.
  • The new dividers that will make the gym three seperate courts
  • The new section of bleachers at the far end of the court
  • Beacons is displayed on the brandnew bleachers
  • The new bleachers are coming together fast
  • The white stain on the court that will be inside the arc
  • A look at the stadium seating
  • The new entrances to the gym are up and awaiting the new glass doors
  • A look at the new ticket tables and entrance into the gym
  • The frame of the brandnew bleachers on the far side of the gym
  • IT is getting all the hardware in the gym for webcasts and different events
  • The new set of bleachers with stadium seating
  • The new entrances into the gym
  • The new gym
  • A look at the nearly completed floor
  • The end of the basketball court
  • A longer look at the new bleachers
  • A look at the nearly completed floor
  • BEACONS!!!
  • The new entrance
  • UMB
  • The new bleachers on the far side of the gym
  • New bleachers
  • The new floor
Previous Image Next Image

View: Mobile | Desktop